National Park Service: Charlestown Navy Yard Building 125 Historical Renovation

National Park Service: Charlestown Navy Yard Building 125 Historical Renovation
Commercial, Infrastructure, Preconstruction
National Park Service, Charlestown Navy Yard Building 125 Historical Renovation Over the course of 10 months, DCBA systematically renovated the historical Building 125, which is located in the Charlestown Navy Yard. Built in 1905, Building 125 was originally used as the Navy Yard’s paint shop and for the construction and ...
Read More
Shire: Boiler Replacement 500 Shire Way
Advanced Technology, Commissioning & Validation, Infrastructure, Preconstruction
Shire, Boiler Replacement 500 Shire Way This project will be executed in the first quarter of 2016 and involves the replacement of two aging boilers with three modern high-efficiency Harsco P-K Termific units. Construction is planned in sequences in order to avoid hot water interruptions to Shire and its tenant, ...
Read More
Bristol-Myers Squibb: Fort Devens Elotuzumab Facility Readiness Project
Advanced Technology, Commissioning & Validation, Infrastructure, Preconstruction
Bristol-Myers Squibb, Fort Devens Elotuzumab Facility Readiness Project Between July 2015 and September 2015, DCBA worked seven days per week, 24 hours per day with dozens of subcontractors from all over the country transform the Fort Devens Elotuzumab Facility, an occupied and operational pharmaceutical manufacturing space, from a single product ...
Read More
Bristol-Myers Squibb: Devens Cryogenics Facility Renovation
Advanced Technology, Commissioning & Validation, Infrastructure, Preconstruction
Bristol-Myers Squibb, Devens Cryogenics Facility Renovation For this 12,000+ sq. ft. project, DCBA repurposed an underutilized chemical storage building into a secure, standalone cryogenic facility that could hold approximately 10,000 liters of drug substance at -40° C while maintaining N+1 redundancy for all process equipment and 100% redundancy for all ...
Read More
Massachusetts Institute of Technology: Chemical Waste Storage Facility
Commissioning & Validation, Infrastructure, Institutional
Massachusetts Institute of Technology, Chemical Waste Storage Facility DCBA was hired to relocate MIT’s Chemical Waste Storage Facility, an undertaking that required workers turn an X-ray laboratory in an occupied building into a hazardous chemical consolidation area. Underground trench drains were installed for chemical spill containment and two existing underground ...
Read More
Exelon Corporation: Mystic Power Plant Hoist Installation
Infrastructure, Preconstruction
Exelon Corporation, Mystic Power Plant Hoist Installation The Exelon Corporation hired DCBA to repurpose and install a hoist next to an operating power plant. Since the hoist had been used in another facility, it was crucial that workers thoroughly reviewed all materials before beginning the project to make sure the ...
Read More
Massachusetts General Hospital: Emergency Power System Upgrade
Commissioning & Validation, Healthcare, Infrastructure, Preconstruction
Massachusetts General Hospital, Emergency Power System Upgrade DCBA performed preconstruction and construction to the emergency power system at MGH’s downtown Boston high-rise hospital building. Preconstruction activities included comprehensive value engineering to make sure that the plan was cost effective, quality-conscious, and met MGH’s expectations. Construction involved installing a new fuel ...
Read More
Novartis: Department of Molecular Pathology Office Renovation
Advanced Technology, Commissioning & Validation, Infrastructure, Preconstruction
Novartis, Department of Molecular Pathology Office Renovation DCBA performed both preconstruction and construction for this fast-tracked project, which was completed within five weeks in order to meet the client’s tight timeline. Preconstruction services included constructability reviews, cost studies (e.g., value engineering) to ensure Novartis’ budget needs were met, and procurement ...
Read More