Sanofi: 78 NYA Glycol Waste Containment Project

Sanofi: 78 NYA Glycol Waste Containment Project
Advanced Technology, Commissioning & Validation
Genzyme | Sanofi, 78 NYA Glycol Waste Containment Project This infrastructure project on Genzyme’s Framingham’s campus included the installation of a containment area for trucks during the pump out of the waste glycol tanks. In the event of a spill, the containment area would capture the glycol, thereby preventing environmental ...
Read More
Shire: Boiler Replacement 500 Shire Way
Advanced Technology, Commissioning & Validation, Infrastructure, Preconstruction
Shire, Boiler Replacement 500 Shire Way This project will be executed in the first quarter of 2016 and involves the replacement of two aging boilers with three modern high-efficiency Harsco P-K Termific units. Construction is planned in sequences in order to avoid hot water interruptions to Shire and its tenant, ...
Read More
Massachusetts General Hospital/Partner’s HealthCare: Animal Suite Mechanical Systems & Ductwork Upgrade
Commissioning & Validation, Healthcare
Massachusetts General Hospital/Partner’s HealthCare, Animal Suite Mechanical Systems & Ductwork Upgrade This multi-phase project included upgrades to the mechanical systems throughout the eighth floor animal suite in a Massachusetts General Hospital/Partners Health Care’s research facility. Temporary walls were erected to separate the construction area from adjacent occupied vivarium spaces. In ...
Read More
Harvard University Museum of Comparative Zoology: Multiphase Laboratory, Office, and Museum Renovations
Commissioning & Validation, Green Building, Institutional
Harvard University Museum of Comparative Zoology, Multiphase Laboratory, Office, and Museum Renovations Phases one through three of this multiphase renovation project focused on the relocation of Harvard’s Museum of Comparative Zoology (MCZ). Working within an occupied space, DCBA converted an open area into new LEED laboratory, classroom, storage, and collections ...
Read More
Bristol-Myers Squibb: Fort Devens Elotuzumab Facility Readiness Project
Advanced Technology, Commissioning & Validation, Infrastructure, Preconstruction
Bristol-Myers Squibb, Fort Devens Elotuzumab Facility Readiness Project Between July 2015 and September 2015, DCBA worked seven days per week, 24 hours per day with dozens of subcontractors from all over the country transform the Fort Devens Elotuzumab Facility, an occupied and operational pharmaceutical manufacturing space, from a single product ...
Read More
Genzyme | Sanofi: QC Laboratory Renovation at 45 & 68 New York Avenue
Advanced Technology, Commissioning & Validation
Genzyme |Sanofi, QC Laboratory Renovation at 45 & 68 New York Avenue Since Genzyme’s QC laboratory was in operation 24-hours-a-day, DCBA diligently coordinated construction activities with the Genzyme Project Team for this renovation, which took place in two occupied biologics buildings and was completed in three phases using a design-build ...
Read More
Bristol-Myers Squibb: Devens Cryogenics Facility Renovation
Advanced Technology, Commissioning & Validation, Infrastructure, Preconstruction
Bristol-Myers Squibb, Devens Cryogenics Facility Renovation For this 12,000+ sq. ft. project, DCBA repurposed an underutilized chemical storage building into a secure, standalone cryogenic facility that could hold approximately 10,000 liters of drug substance at -40° C while maintaining N+1 redundancy for all process equipment and 100% redundancy for all ...
Read More
Massachusetts Institute of Technology: Chemical Waste Storage Facility
Commissioning & Validation, Infrastructure, Institutional
Massachusetts Institute of Technology, Chemical Waste Storage Facility DCBA was hired to relocate MIT’s Chemical Waste Storage Facility, an undertaking that required workers turn an X-ray laboratory in an occupied building into a hazardous chemical consolidation area. Underground trench drains were installed for chemical spill containment and two existing underground ...
Read More
Museum of Science–Boston: Lobby Curtain Wall Renovation
Commissioning & Validation, Green Building, Preconstruction
Museum of Science–Boston, Lobby Curtain Wall Renovation The innovative and exciting Museum of Science Lobby Curtain Wall Project included preconstruction and renovation services for a 50’ x 50’ curtain wall system/façade in the main lobby. This project required careful coordination with the Museum of Science in order to protect its ...
Read More